SteveKreis - 06 Aug 2008
from Pete: On the corrective action form I don't see any place to put the part number or Job number. I think this is something we have to look at.
Also: Here is a reminder that we have to go over the production process overview flowchart. We have to talk about what should be first.....ordering material or making a traveler or router.
--
SteveKreis - 13 Oct 2008
Process Audit ideas: Collect info before audit as follows:
- Process Name
- Process Owners
- Top Level Control Procedures
- Sub-process Procedures
- Key Personnel
- Inputs to Process
- Summary of Process Steps
- Output from the Process
- Next Step in the Process
- Documents and Records Reviewed By the Auditor.
Not an audit to the standard or the elements; an audit to the process
--
SteveKreis - 14 Oct 2008
Right now, we have flowchart attachments in Quality Policy Web AND procedure web. Some are duplicates. Should be all in one place.
Also, need to protect flowcharts. (Joe got to wrong FC via Index on main page)
--
SteveKreis - 24 Nov 2008
Where are we filing the routers/travelers when the job is finished? I don't see this on the flowcharts.
--
SteveKreis - 25 Nov 2008
Victor the auditor thinks our routers are to generic.He feels that when we have milling or turning on our router which may cover 4 different operations it does not cover enough detail and instructions.
--
PeteKeller - 25 Nov 2008
Have to discuss what we do with all the routers we generate when were finish with a job.Example is the boeing dolly job!
--
PeteKeller - 26 Nov 2008
When we generate routers we should put the operations in sequence on how we want the part to be made.
--
PeteKeller - 29 Apr 2009
Information on the routers is not being completed correctly. We are not putting Po#'s on the routers for material,we are not putting the po's on the router for the outside processes.
--
PeteKeller - 29 Apr 2009
We have to discuss Bom sheets. I've noticed that we have quote sheet and a bom sheet. We have to try and make a simplified quote sheet that if we get the order we can make that into our bom sheet. Do we really need all that information on the bom sheet and do we really need all those columns?
--
PeteKeller - 30 Apr 2009
We have to discuss about trying to generate all travelers or routers in our jobboss system. We might be able to do this by using the components section for each government job under the job number.
--
PeteKeller - 30 Apr 2009
We need to set up a computer station out in the shop where employees can have access to it. To get into twiki so they can enter comments or read the quality manual or we also can figure out some kind of system where employees can put information in about a part that should be machined differently....for example a part might have holes for a name plate on the assembly drawing but not on the part drawing.
--
PeteKeller - 30 Apr 2009
--
SungYong - 08 May 2009
Feedback to the comments made in TWIKI - Feedback to the comments made-08.May 2009
These comments will be reviewed at monthly management review meetings; this is an important source of continuous improvement ideas.
--
SteveKreis - 11 May 2009
--
AldoAndrade - 14 May 2009
--
AldoAndrade - 14 May 2009
I suggest that we shouldnt put any jobs to the shipping area with out a router or shipping paperwork especialy if it's not identified by any job number or part number.
--
AldoAndrade - 14 May 2009
Jobs ready to ship must be moved along with a router or shipping paperwork to the shipping area.
--
AldoAndrade - 14 May 2009
Revisions on Router does not always match the prints. We should always put the revision of the print that's be used for manufacturing and inspection. This way there will be no confusion later.
--
JoeGonzalez - 19 May 2009
If we receive a part from a outside process and we reject that process from the vendor I don't see anthing in our flowcharts or procedures on how to handle the situation. Do we use the same po whan we send back the parts? Do we use a -r on the po instead? Do we write up a scar when we send the parts back?
--
PeteKeller - 29 May 2009
On our supplier corrective action request form there should be a job number reference on the form.
--
PeteKeller - 02 Jun 2009
Avoid using PDFs in the TWIKI system. Use the TWIKI editor to write, edit and manage your written system documentation. PDFs are good for graphic items or Flowcharts but they are problematic for WRITTEN processes, procedures or work instructions. This is because the system does not automatically manage PDF documents in the same way it manages web pages created within the TWIKI system.
--
SteveKreis - 14 Jun 2009
comment by Joe Kunst/ suggested by AS9100 auditor Have one shelf in chemical cabinet dedicated to controlled materials/ put expired or non-controlled material in different place
--
KreisTool - 22 Jul 2009
Thank you for training!
--
KreisTool - 03 Aug 2009
Marian is trained today!
--
KreisTool - 03 Aug 2009
The Quality inspection flowchart, note 2 states that a Bill Of
Material is produced for every government job. This is not
true. Example : Northrop single part orders do not have a Bom.
Maybe we should change the note to say government assembly
jobs!
--
PeteKeller - 09 Oct 2009
Supplier approval flowhart needs to be discussed.
The Flowchart only gives 2 positions authority to make
any decisions. Purchasing Manager and Quality Manager.
--
PeteKeller - 09 Oct 2009
Internal audit process says that we use a audit checklist
to conduct our audit. We do?
--
PeteKeller - 09 Oct 2009